TECHPORT SYSTEMS CENTRE AND RAYTHEON BUILDING

Osborne, South Australia

bg-object2_edited.png

CLIENT

Defense SA

PROJECT SCOPE

Earthworks, Siteworks, and Stormwater

PROJECT SUMMARY

CONSTRUCTION SUMMARY

    Earthworks and Site Works package including, but not limited to;

    • Detailed bulk earthworks.

    • Detailed site‐works.

    • Concrete paving.

    • Concrete spoon drains.

    • Kerbing.

    • Pram ramps.

    • Spoon drains.

    • Tactile indicators.

    • Crossovers.

    • Edge restraints.

    • Bitumen paving.

    • Line marking.

    • Rubble preparation under all sealed surfaces.

    • Compaction testing as specified.


    Storm‐water works including, but not limited to;

    • Pipe‐work.

    • Sumps and grates.

    • All swales.

    • All ponds.

    • Rain‐garden.

    • Rain‐store harvesting tanks.

    • Head/retainer walls.

    Rock work.